Auger and Postcrete required
The C Pile foundation is suitable for sites where breaking ground is possible and geotechnical results permit use. Performs well in softer ground conditions.
Installation:
Auger to dig holes, postcrete to fix pile into the ground
Material:
S350, S450 galvanized steel (ZM310, ZM430, ZM620, ZM800). Corrosion protection to be determined from site location and ground investigations.
Reviews
There are no reviews yet.